Doosan Škoda Power s.r.o

(2024 – ONGOING) Insulation and Sheet Metal Work – MO4, Mochovce NPP


(2024) Connection of Drainage Piping – MO4, Mochovce NPP


(2024) Preservation of Distribution Wheels – MO4, Mochovce NPP


(2024) Locking of Condensers TG31, TG32 – MO3, Mochovce NPP


(2023 – ONGOING) Installation of a Soundproof Box – Mochovce NPP


(2021-2022) Manufacture of 2 Stands – Mochovce NPP


(2020-2021) Replacement of TCS system – Modifications of BIS, WEPAS – MO12, Mochovce NPP


(2019) Modification of VTH Pipes for TG31,32,41,42 Turbines at Mochovce NPP – EMO 34, Mochovce NPP


(2019) 19SL15 – Installation Works at MO34 NPP – EMO 34, Mochovce NPP


(2019) Installation of Seismic Stops – EMO 34, Mochovce NPP


Scroll to Top