SLOVENSKÉ ELEKTRÁRNE, a. s.
Years: 2014 – ongoing
Mochovce
Artificial Lighting and Heavy-current Distribution Systems, Lightning Conductor and Earthing at CS 801/1-02, Units 3 and 4
Years: 2014 – ongoing
Mochovce
Artificial Lighting and Heavy-current Distribution Systems, Lightning Conductor and Earthing at CS 801/1-02, Units 3 and 4
Designing, supplying, engineering, coordination, installation, tests, commissioning of the artificial lighting and heavy-current distribution systems
Years: 2010 – 2012
Mochovce
Replacement of the Top Level regarding the Control and Information System for HVAC and Auxiliary Systems – Mochovce NPP, Units 1&2; Investment Project no.: IPR EMO 25 100
Supplying, installation, tests and as-built documentation
Year: 2010
Jaslovské Bohunice
EBO 9000 – Units’ Power Output Increase at Jaslovské Bohunice NPP, V2
Investment Project: IPR EBO 90000 – Technical support in the scope of:
Years: 2009 – Ongoing
Mochovce
Completion of Mochovce NPP, Units 3&4 – Design, Delivery, Assembly and Tests of the Respective Elementary Systems
Elaboration of the detail design documentation; provision of deliveries; assembly/installation; performance of tests (PICO – Post-Installation Cleaning Operations, POT – Pre-Operational Testing, CT – Commissioning Testing) of elementary systems at Mochovce NPP: PS 03,11,14 and 54; including: quality assurance and quality control documentation; accompanying technical documentation; time schedules; documents concerning safety and health protection introduced within STC (Safety and Technical Conditions of Performance) and provision of all other materials, works and services concerning the Unit 3 and common systems of the Units 3&4.
Year: 2009
Jaslovské Bohunice
Technical support – Contractors Coordination in the course of the General Overhaul at the Units 3&4
Investment Project: EBO 90000 – Technical support in the scope of:
Year: 2008
Jaslovské Bohunice
Electro and I&C Part Tests Management and Coordination at the Units 3&4, Jaslovské Bohunice NPP, V2 carried out during Units Outage (2008) within the Scope of MOD (Modernization) Project V2; Investment Project no.: IPR 711
Job no. 711 MOD V2 – Increase of nuclear safety and seismic resistance of Jaslovské Bohunice NPP, V2. Control and coordination of tests of Electro and I&C equipment at the Units 3&4 performed during the outage in 2007 – in the following scope:
Year: 2008
Jaslovské Bohunice
Total Units’ Power Output Increase, MOD Project – Jaslovské Bohunice NPP – Works Coordination
Investment Project – IPR 90000 – V2 – Provision of engineering activities for the project: “Increase of total units’ power output”: coordination of works between maintenance division and individual contractors for ELECTRO and I&C Project-parts; coordination and control of functional tests; coordination and control of tests in compliance with POT (pre-operational testing) and CT (commissioning testing) programmes; Inspection of DD with reference to the generator G41 modification and replacement of measuring nozzles at NPP V2, Units 3&4.
Years: 2006 – 2009
Mochovce
MADAM S Information System Top Level Replacement – Mochovce NPP, Units 1 and 2
Years: 2004 – 2007
Jaslovské Bohunice
Increase of Nuclear Safety and Seismic Resistance of Jaslovské Bohunice NPP V2; Modernization of the Essential Service Water (ÚM 09.00 TVD) & Control Rooms (ÚM V01 Control Rooms)
Job no. 711 – increase of nuclear safety and seismic resistance at the Jaslovské Bohunice NPP – V2, G7 – control and coordination of tests regarding ELECTRO and I&C parts; technical inspection of the monitored equipment performed during general overhaul of Units 3 and 4 in 2008 (general overhaul of Units 3&4/2008) at Slovenské elektrárne, a. s. – plant: Bohunice NPP within the following scope:
Year: 2000
Nováky
Technical Support during the Reconstruction of the Turbine Generator and its Accessories – Nováky NPP, Unit 4
Technical support during the turbine generator (TG) reconstruction:
Years: 1999 – 2000
Temelín, Česká republika
Technical Support for the General Supplier of the Technological Part by Commissioning of Temelín NPP, Units 1&2
Supervision over the monitors’ installation completion with reference to PP/t (Operating Instructions/technology) dPP/t (Partial Operating Instructions/technology) and respective contractors’ documentation; coordination of reference/background materials for elaboration of initial revisions; examination of the accompanying technical documentation; inspection of monitors’ connection and functioning; professional supervision over POT (pre-operational testing) and CT (commissioning testing) of the Radiation Monitoring Systems regarding: MRB (Main Reactor Building), NAB (Nuclear Auxiliary Building), MRB stacks, NAB stacks and waste water of elementary subsystems (DPS) of both units at Temelín NPP.
Years: 1998 – 2000
Mochovce
Key Contract for Mochovce NPP Unit 2, IO – Auxiliary Systems
Completion of the Unit 2, Mochovce NPP within the scope of: projects completion, provision of the remaining deliveries, assembly completion, implementation of individual safety measures and design changes, settlement of unfinished works and their execution regarding the elementary systems: PS 03,11,14 and 54 – Unit 2.
Years: 1997 – 2000
Mochovce
Start-up Works at Mochovce NPP, Units 1 and 2
Update of POT (Pre-operational testing) and CT (commissioning testing) programmes; elaboration of POT and CT programmes; control of PICO performance (post-installation cleaning operations) and DPS (Elementary subsystem) in compliance with the valid Technological Detail Design; control of POT and CT with reference to individual DPS; performance of hydraulic tests at the primary circuit piping, in the course of active commissioning: