{"id":27546,"date":"2025-10-08T10:53:25","date_gmt":"2025-10-08T08:53:25","guid":{"rendered":"https:\/\/www.enseco.sk\/reconstruction-of-the-teg-regeneration-circuit-for-absorption-column-ak1ab-for-pozagas\/"},"modified":"2026-03-27T10:06:00","modified_gmt":"2026-03-27T09:06:00","slug":"reconstruction-of-the-teg-regeneration-circuit-for-absorption-column-ak1ab-for-pozagas","status":"publish","type":"post","link":"https:\/\/www.enseco.sk\/en\/reconstruction-of-the-teg-regeneration-circuit-for-absorption-column-ak1ab-for-pozagas\/","title":{"rendered":"Reconstruction of the TEG Regeneration Circuit for Absorption Column AK1AB for POZAGAS"},"content":{"rendered":"\n<div style=\"height:20px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<h3 class=\"wp-block-heading\">Project Duration: September 2024 \u2013 ONGOING<\/h3>\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<p style=\"font-size:18px\">Our client POZAGAS, a. s., entrusted us with the EPC project of complex reconstruction and refurbishment of the TEG regeneration circuit for the absorption column AK1AB. The upgrade was necessary due to the technical wear and tear of the existing regeneration equipment. The project was executed as a turnkey delivery and included the following stages:  <\/p>\n\n<div style=\"height:21px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<ol class=\"wp-block-list\">\n<li style=\"font-size:18px\">Project design and documentation<\/li>\n\n\n\n<li style=\"font-size:18px\">Dismantling of the existing technology<\/li>\n\n\n\n<li style=\"font-size:18px\">Construction of foundations for the air cooler and transformer<\/li>\n\n\n\n<li style=\"font-size:18px\">Reconstruction and refurbishment of steel structures<\/li>\n\n\n\n<li style=\"font-size:18px\">Refurbishment of the TEG regenerators 1 A,B, installatin of new technology<\/li>\n\n\n\n<li style=\"font-size:18px\">Electrical works and instrumentation &amp; control activities<\/li>\n\n\n\n<li style=\"font-size:18px\">Functional testing and commissioning into permanent operation<\/li>\n<\/ol>\n\n<div style=\"height:21px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<h5 class=\"wp-block-heading\">Execution with In-house Capacities<\/h5>\n\n<div style=\"height:21px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<p style=\"font-size:18px\">After dismantling the original technology, the necessary construction works followed \u2014 specifically, the construction of foundations for the overhead vapor cooler and for the electrical switchboard. Subsequently, the steel structure was refurbished and modified to include a retention basin in its lower part. The works continued with the installation of two heat exchangers manufactured in our own workshop, as well as the supplied equipment: reconcentration boiler, burner, three pumps, condensate separator, carbon filter, and all corresponding valves, pipelines, and fittings. Outside the skid (where the main technology is located), we installed the overhead vapor cooler on the prepared foundations.   <\/p>\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<figure class=\"wp-block-image aligncenter size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"749\" height=\"500\" src=\"https:\/\/www.enseco.sk\/wp-content\/uploads\/2025\/10\/DSC_1037-749x500.jpg\" alt=\"\" class=\"wp-image-27321\" srcset=\"https:\/\/www.enseco.sk\/wp-content\/uploads\/2025\/10\/DSC_1037-749x500.jpg 749w, https:\/\/www.enseco.sk\/wp-content\/uploads\/2025\/10\/DSC_1037-300x200.jpg 300w, https:\/\/www.enseco.sk\/wp-content\/uploads\/2025\/10\/DSC_1037-768x513.jpg 768w, https:\/\/www.enseco.sk\/wp-content\/uploads\/2025\/10\/DSC_1037-1536x1025.jpg 1536w, https:\/\/www.enseco.sk\/wp-content\/uploads\/2025\/10\/DSC_1037-2048x1367.jpg 2048w\" sizes=\"(max-width: 749px) 100vw, 749px\" \/><\/figure>\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<h3 class=\"wp-block-heading\">Scope of our Activities:<\/h3>\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<ul class=\"wp-block-list\">\n<li style=\"font-size:18px\"><em>Project activities: detailed design documentation, 3D modeling, process, structural, and hydraulic calculations, system analysis, CED, as-built documentation, equipment testing documentation, designer\u2019s supervision<\/em><\/li>\n\n\n\n<li style=\"font-size:18px\"><em>Dismantling works: removal of the old skid with outdated technology<\/em><\/li>\n\n\n\n<li style=\"font-size:18px\"><em>Supply and installation of new equipment: TEG regenerator, reconcentration boiler burner, heat exchangers, overhead vapor cooler, condensate separator, spray pump, TEG pump, mine water pump, carbon filter, valves, pipelines, and fittings<\/em><\/li>\n\n\n\n<li style=\"font-size:18px\"><em>Steel structures: dismantling, refurbishment, modification, and reassembly of support structures<\/em><\/li>\n\n\n\n<li style=\"font-size:18px\"><em>Electrical works: implementation of power distribution systems, lightning protection, and grounding<\/em><\/li>\n\n\n\n<li style=\"font-size:18px\"><em>Automation and control systems: installation of flow measurement for fuel gas, TEG level sensors, process temperature and pressure sensors, and control of the RK1AB burner, overhead vapor cooler, and pumps<\/em><\/li>\n\n\n\n<li style=\"font-size:18px\"><em>Insulation and coating works<\/em><\/li>\n\n\n\n<li style=\"font-size:18px\"><em>NDT testing performed in-house (VT, RT, UT, MT, PT)<\/em><\/li>\n\n\n\n<li style=\"font-size:18px\"><em>Functional and commissioning testing, including a 72-hour performance test<\/em><\/li>\n\n\n\n<li style=\"font-size:18px\"><em>Legalization and development of accompanying technical documentation<\/em><\/li>\n<\/ul>\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"749\" height=\"500\" src=\"https:\/\/www.enseco.sk\/wp-content\/uploads\/2025\/10\/DSC_1063-749x500.jpg\" alt=\"\" class=\"wp-image-27268\" srcset=\"https:\/\/www.enseco.sk\/wp-content\/uploads\/2025\/10\/DSC_1063-749x500.jpg 749w, https:\/\/www.enseco.sk\/wp-content\/uploads\/2025\/10\/DSC_1063-300x200.jpg 300w, https:\/\/www.enseco.sk\/wp-content\/uploads\/2025\/10\/DSC_1063-768x513.jpg 768w, https:\/\/www.enseco.sk\/wp-content\/uploads\/2025\/10\/DSC_1063-1536x1025.jpg 1536w, https:\/\/www.enseco.sk\/wp-content\/uploads\/2025\/10\/DSC_1063-2048x1367.jpg 2048w\" sizes=\"(max-width: 749px) 100vw, 749px\" \/><\/figure>\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<h3 class=\"wp-block-heading\">Project Result<\/h3>\n\n<div style=\"height:21px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<p style=\"font-size:18px\">By implementing Best Available Techniques (BAT) in compliance with EU legislation, we achieved significant improvements in both the spatial layout and operational efficiency of the technological process. The original four heat exchangers were replaced by two, simplifying and streamlining the entire system. We also improved access to the boiler assembly, making maintenance much easier. The result is a modernized technological solution that ensures lower emissions and higher operational efficiency for the client.    <\/p>\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"375\" height=\"500\" data-id=\"28463\" src=\"https:\/\/www.enseco.sk\/wp-content\/uploads\/2025\/10\/IMG_20260128_105031210_HDR-375x500.jpg\" alt=\"\" class=\"wp-image-28463\" srcset=\"https:\/\/www.enseco.sk\/wp-content\/uploads\/2025\/10\/IMG_20260128_105031210_HDR-375x500.jpg 375w, https:\/\/www.enseco.sk\/wp-content\/uploads\/2025\/10\/IMG_20260128_105031210_HDR-225x300.jpg 225w, https:\/\/www.enseco.sk\/wp-content\/uploads\/2025\/10\/IMG_20260128_105031210_HDR-768x1024.jpg 768w, https:\/\/www.enseco.sk\/wp-content\/uploads\/2025\/10\/IMG_20260128_105031210_HDR-1152x1536.jpg 1152w, https:\/\/www.enseco.sk\/wp-content\/uploads\/2025\/10\/IMG_20260128_105031210_HDR-1536x2048.jpg 1536w, https:\/\/www.enseco.sk\/wp-content\/uploads\/2025\/10\/IMG_20260128_105031210_HDR-scaled.jpg 1920w\" sizes=\"(max-width: 375px) 100vw, 375px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"375\" height=\"500\" data-id=\"28462\" src=\"https:\/\/www.enseco.sk\/wp-content\/uploads\/2025\/10\/IMG_20260128_104923276_HDR-375x500.jpg\" alt=\"\" class=\"wp-image-28462\" srcset=\"https:\/\/www.enseco.sk\/wp-content\/uploads\/2025\/10\/IMG_20260128_104923276_HDR-375x500.jpg 375w, https:\/\/www.enseco.sk\/wp-content\/uploads\/2025\/10\/IMG_20260128_104923276_HDR-225x300.jpg 225w, https:\/\/www.enseco.sk\/wp-content\/uploads\/2025\/10\/IMG_20260128_104923276_HDR-768x1024.jpg 768w, https:\/\/www.enseco.sk\/wp-content\/uploads\/2025\/10\/IMG_20260128_104923276_HDR-1152x1536.jpg 1152w, https:\/\/www.enseco.sk\/wp-content\/uploads\/2025\/10\/IMG_20260128_104923276_HDR-1536x2048.jpg 1536w, https:\/\/www.enseco.sk\/wp-content\/uploads\/2025\/10\/IMG_20260128_104923276_HDR-scaled.jpg 1920w\" sizes=\"(max-width: 375px) 100vw, 375px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"375\" height=\"500\" data-id=\"28460\" src=\"https:\/\/www.enseco.sk\/wp-content\/uploads\/2025\/10\/IMG_20260128_104911191_HDR-375x500.jpg\" alt=\"\" class=\"wp-image-28460\" srcset=\"https:\/\/www.enseco.sk\/wp-content\/uploads\/2025\/10\/IMG_20260128_104911191_HDR-375x500.jpg 375w, https:\/\/www.enseco.sk\/wp-content\/uploads\/2025\/10\/IMG_20260128_104911191_HDR-225x300.jpg 225w, https:\/\/www.enseco.sk\/wp-content\/uploads\/2025\/10\/IMG_20260128_104911191_HDR-768x1024.jpg 768w, https:\/\/www.enseco.sk\/wp-content\/uploads\/2025\/10\/IMG_20260128_104911191_HDR-1152x1536.jpg 1152w, https:\/\/www.enseco.sk\/wp-content\/uploads\/2025\/10\/IMG_20260128_104911191_HDR-1536x2048.jpg 1536w, https:\/\/www.enseco.sk\/wp-content\/uploads\/2025\/10\/IMG_20260128_104911191_HDR-scaled.jpg 1920w\" sizes=\"(max-width: 375px) 100vw, 375px\" \/><\/figure>\n<\/figure>\n\n<div style=\"height:100px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" src=\"https:\/\/www.enseco.sk\/wp-content\/uploads\/2025\/10\/logo.svg\" alt=\"\" class=\"wp-image-27269\"\/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Project Duration: September 2024 \u2013 ONGOING Our client POZAGAS, a. s., entrusted us with the EPC project of complex reconstruction and refurbishment of the TEG regeneration circuit for the absorption column AK1AB. The upgrade was necessary due to the technical wear and tear of the existing regeneration equipment. The project was executed as a turnkey delivery and included the following stages: Execution with In-house Capacities After dismantling the original technology, the necessary construction works followed \u2014 specifically, the construction of foundations for the overhead vapor cooler and for the electrical switchboard. Subsequently, the steel structure was refurbished and modified to include a retention basin in its lower part. The works continued with the installation of two heat exchangers manufactured in our own workshop, as well as the supplied equipment: reconcentration boiler, burner, three pumps, condensate separator, carbon filter, and all corresponding valves, pipelines, and fittings. Outside the skid (where the main technology is located), we installed the overhead vapor cooler on the prepared foundations. Scope of our Activities: Project Result By implementing Best Available Techniques (BAT) in compliance with EU legislation, we achieved significant improvements in both the spatial layout and operational efficiency of the technological process. The original four heat exchangers were replaced by two, simplifying and streamlining the entire system. We also improved access to the boiler assembly, making maintenance much easier. The result is a modernized technological solution that ensures lower emissions and higher operational efficiency for the client.<\/p>\n","protected":false},"author":3,"featured_media":28465,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[47,43],"tags":[],"class_list":["post-27546","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-article-reference","category-business-partners"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.2 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Design and Project Implementation at POZAGAS, a. s. | ENSECO - enseco.sk<\/title>\n<meta name=\"description\" content=\"As part of an EPC project, we carried out the reconstruction of the TEG regeneration circuit for the absorption column AK1AB for our client POZAGAS.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.enseco.sk\/en\/reconstruction-of-the-teg-regeneration-circuit-for-absorption-column-ak1ab-for-pozagas\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Design and Project Implementation at POZAGAS, a. s. | ENSECO - enseco.sk\" \/>\n<meta property=\"og:description\" content=\"As part of an EPC project, we carried out the reconstruction of the TEG regeneration circuit for the absorption column AK1AB for our client POZAGAS.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.enseco.sk\/en\/reconstruction-of-the-teg-regeneration-circuit-for-absorption-column-ak1ab-for-pozagas\/\" \/>\n<meta property=\"og:site_name\" content=\"enseco.sk\" \/>\n<meta property=\"article:published_time\" content=\"2025-10-08T08:53:25+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-27T09:06:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.enseco.sk\/wp-content\/uploads\/2025\/10\/IMG_20260128_104926084_HDR-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1920\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Matej Pobe\u017eal\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Matej Pobe\u017eal\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.enseco.sk\/en\/reconstruction-of-the-teg-regeneration-circuit-for-absorption-column-ak1ab-for-pozagas\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.enseco.sk\/en\/reconstruction-of-the-teg-regeneration-circuit-for-absorption-column-ak1ab-for-pozagas\/\"},\"author\":{\"name\":\"Matej Pobe\u017eal\",\"@id\":\"https:\/\/www.enseco.sk\/en\/#\/schema\/person\/38e981da5fa52310922e236f85e64524\"},\"headline\":\"Reconstruction of the TEG Regeneration Circuit for Absorption Column AK1AB for POZAGAS\",\"datePublished\":\"2025-10-08T08:53:25+00:00\",\"dateModified\":\"2026-03-27T09:06:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.enseco.sk\/en\/reconstruction-of-the-teg-regeneration-circuit-for-absorption-column-ak1ab-for-pozagas\/\"},\"wordCount\":447,\"publisher\":{\"@id\":\"https:\/\/www.enseco.sk\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.enseco.sk\/en\/reconstruction-of-the-teg-regeneration-circuit-for-absorption-column-ak1ab-for-pozagas\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.enseco.sk\/wp-content\/uploads\/2025\/10\/IMG_20260128_104926084_HDR-scaled.jpg\",\"articleSection\":[\"Article reference\",\"Business partners\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.enseco.sk\/en\/reconstruction-of-the-teg-regeneration-circuit-for-absorption-column-ak1ab-for-pozagas\/\",\"url\":\"https:\/\/www.enseco.sk\/en\/reconstruction-of-the-teg-regeneration-circuit-for-absorption-column-ak1ab-for-pozagas\/\",\"name\":\"Design and Project Implementation at POZAGAS, a. s. | ENSECO - enseco.sk\",\"isPartOf\":{\"@id\":\"https:\/\/www.enseco.sk\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.enseco.sk\/en\/reconstruction-of-the-teg-regeneration-circuit-for-absorption-column-ak1ab-for-pozagas\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.enseco.sk\/en\/reconstruction-of-the-teg-regeneration-circuit-for-absorption-column-ak1ab-for-pozagas\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.enseco.sk\/wp-content\/uploads\/2025\/10\/IMG_20260128_104926084_HDR-scaled.jpg\",\"datePublished\":\"2025-10-08T08:53:25+00:00\",\"dateModified\":\"2026-03-27T09:06:00+00:00\",\"description\":\"As part of an EPC project, we carried out the reconstruction of the TEG regeneration circuit for the absorption column AK1AB for our client POZAGAS.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.enseco.sk\/en\/reconstruction-of-the-teg-regeneration-circuit-for-absorption-column-ak1ab-for-pozagas\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.enseco.sk\/en\/reconstruction-of-the-teg-regeneration-circuit-for-absorption-column-ak1ab-for-pozagas\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.enseco.sk\/en\/reconstruction-of-the-teg-regeneration-circuit-for-absorption-column-ak1ab-for-pozagas\/#primaryimage\",\"url\":\"https:\/\/www.enseco.sk\/wp-content\/uploads\/2025\/10\/IMG_20260128_104926084_HDR-scaled.jpg\",\"contentUrl\":\"https:\/\/www.enseco.sk\/wp-content\/uploads\/2025\/10\/IMG_20260128_104926084_HDR-scaled.jpg\",\"width\":2560,\"height\":1920},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.enseco.sk\/en\/reconstruction-of-the-teg-regeneration-circuit-for-absorption-column-ak1ab-for-pozagas\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.enseco.sk\/en\/home\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Business partners\",\"item\":\"https:\/\/www.enseco.sk\/en\/category\/business-partners\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Reconstruction of the TEG Regeneration Circuit for Absorption Column AK1AB for POZAGAS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.enseco.sk\/en\/#website\",\"url\":\"https:\/\/www.enseco.sk\/en\/\",\"name\":\"enseco.sk\",\"description\":\"enseco.sk\",\"publisher\":{\"@id\":\"https:\/\/www.enseco.sk\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.enseco.sk\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.enseco.sk\/en\/#organization\",\"name\":\"enseco.sk\",\"url\":\"https:\/\/www.enseco.sk\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.enseco.sk\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.enseco.sk\/wp-content\/uploads\/2019\/07\/cropped-logo-normal.png\",\"contentUrl\":\"https:\/\/www.enseco.sk\/wp-content\/uploads\/2019\/07\/cropped-logo-normal.png\",\"width\":355,\"height\":118,\"caption\":\"enseco.sk\"},\"image\":{\"@id\":\"https:\/\/www.enseco.sk\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.linkedin.com\/company\/ensecoas\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.enseco.sk\/en\/#\/schema\/person\/38e981da5fa52310922e236f85e64524\",\"name\":\"Matej Pobe\u017eal\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.enseco.sk\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/34f49bd783137c7f1515e9e1b49061506bf355efa9fc1b47eda6181864f6f31e?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/34f49bd783137c7f1515e9e1b49061506bf355efa9fc1b47eda6181864f6f31e?s=96&d=mm&r=g\",\"caption\":\"Matej Pobe\u017eal\"},\"url\":\"https:\/\/www.enseco.sk\/en\/author\/matej\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Design and Project Implementation at POZAGAS, a. s. | ENSECO - enseco.sk","description":"As part of an EPC project, we carried out the reconstruction of the TEG regeneration circuit for the absorption column AK1AB for our client POZAGAS.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.enseco.sk\/en\/reconstruction-of-the-teg-regeneration-circuit-for-absorption-column-ak1ab-for-pozagas\/","og_locale":"en_US","og_type":"article","og_title":"Design and Project Implementation at POZAGAS, a. s. | ENSECO - enseco.sk","og_description":"As part of an EPC project, we carried out the reconstruction of the TEG regeneration circuit for the absorption column AK1AB for our client POZAGAS.","og_url":"https:\/\/www.enseco.sk\/en\/reconstruction-of-the-teg-regeneration-circuit-for-absorption-column-ak1ab-for-pozagas\/","og_site_name":"enseco.sk","article_published_time":"2025-10-08T08:53:25+00:00","article_modified_time":"2026-03-27T09:06:00+00:00","og_image":[{"width":2560,"height":1920,"url":"https:\/\/www.enseco.sk\/wp-content\/uploads\/2025\/10\/IMG_20260128_104926084_HDR-scaled.jpg","type":"image\/jpeg"}],"author":"Matej Pobe\u017eal","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Matej Pobe\u017eal","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.enseco.sk\/en\/reconstruction-of-the-teg-regeneration-circuit-for-absorption-column-ak1ab-for-pozagas\/#article","isPartOf":{"@id":"https:\/\/www.enseco.sk\/en\/reconstruction-of-the-teg-regeneration-circuit-for-absorption-column-ak1ab-for-pozagas\/"},"author":{"name":"Matej Pobe\u017eal","@id":"https:\/\/www.enseco.sk\/en\/#\/schema\/person\/38e981da5fa52310922e236f85e64524"},"headline":"Reconstruction of the TEG Regeneration Circuit for Absorption Column AK1AB for POZAGAS","datePublished":"2025-10-08T08:53:25+00:00","dateModified":"2026-03-27T09:06:00+00:00","mainEntityOfPage":{"@id":"https:\/\/www.enseco.sk\/en\/reconstruction-of-the-teg-regeneration-circuit-for-absorption-column-ak1ab-for-pozagas\/"},"wordCount":447,"publisher":{"@id":"https:\/\/www.enseco.sk\/en\/#organization"},"image":{"@id":"https:\/\/www.enseco.sk\/en\/reconstruction-of-the-teg-regeneration-circuit-for-absorption-column-ak1ab-for-pozagas\/#primaryimage"},"thumbnailUrl":"https:\/\/www.enseco.sk\/wp-content\/uploads\/2025\/10\/IMG_20260128_104926084_HDR-scaled.jpg","articleSection":["Article reference","Business partners"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.enseco.sk\/en\/reconstruction-of-the-teg-regeneration-circuit-for-absorption-column-ak1ab-for-pozagas\/","url":"https:\/\/www.enseco.sk\/en\/reconstruction-of-the-teg-regeneration-circuit-for-absorption-column-ak1ab-for-pozagas\/","name":"Design and Project Implementation at POZAGAS, a. s. | ENSECO - enseco.sk","isPartOf":{"@id":"https:\/\/www.enseco.sk\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.enseco.sk\/en\/reconstruction-of-the-teg-regeneration-circuit-for-absorption-column-ak1ab-for-pozagas\/#primaryimage"},"image":{"@id":"https:\/\/www.enseco.sk\/en\/reconstruction-of-the-teg-regeneration-circuit-for-absorption-column-ak1ab-for-pozagas\/#primaryimage"},"thumbnailUrl":"https:\/\/www.enseco.sk\/wp-content\/uploads\/2025\/10\/IMG_20260128_104926084_HDR-scaled.jpg","datePublished":"2025-10-08T08:53:25+00:00","dateModified":"2026-03-27T09:06:00+00:00","description":"As part of an EPC project, we carried out the reconstruction of the TEG regeneration circuit for the absorption column AK1AB for our client POZAGAS.","breadcrumb":{"@id":"https:\/\/www.enseco.sk\/en\/reconstruction-of-the-teg-regeneration-circuit-for-absorption-column-ak1ab-for-pozagas\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.enseco.sk\/en\/reconstruction-of-the-teg-regeneration-circuit-for-absorption-column-ak1ab-for-pozagas\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.enseco.sk\/en\/reconstruction-of-the-teg-regeneration-circuit-for-absorption-column-ak1ab-for-pozagas\/#primaryimage","url":"https:\/\/www.enseco.sk\/wp-content\/uploads\/2025\/10\/IMG_20260128_104926084_HDR-scaled.jpg","contentUrl":"https:\/\/www.enseco.sk\/wp-content\/uploads\/2025\/10\/IMG_20260128_104926084_HDR-scaled.jpg","width":2560,"height":1920},{"@type":"BreadcrumbList","@id":"https:\/\/www.enseco.sk\/en\/reconstruction-of-the-teg-regeneration-circuit-for-absorption-column-ak1ab-for-pozagas\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.enseco.sk\/en\/home\/"},{"@type":"ListItem","position":2,"name":"Business partners","item":"https:\/\/www.enseco.sk\/en\/category\/business-partners\/"},{"@type":"ListItem","position":3,"name":"Reconstruction of the TEG Regeneration Circuit for Absorption Column AK1AB for POZAGAS"}]},{"@type":"WebSite","@id":"https:\/\/www.enseco.sk\/en\/#website","url":"https:\/\/www.enseco.sk\/en\/","name":"enseco.sk","description":"enseco.sk","publisher":{"@id":"https:\/\/www.enseco.sk\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.enseco.sk\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.enseco.sk\/en\/#organization","name":"enseco.sk","url":"https:\/\/www.enseco.sk\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.enseco.sk\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.enseco.sk\/wp-content\/uploads\/2019\/07\/cropped-logo-normal.png","contentUrl":"https:\/\/www.enseco.sk\/wp-content\/uploads\/2019\/07\/cropped-logo-normal.png","width":355,"height":118,"caption":"enseco.sk"},"image":{"@id":"https:\/\/www.enseco.sk\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/ensecoas\/"]},{"@type":"Person","@id":"https:\/\/www.enseco.sk\/en\/#\/schema\/person\/38e981da5fa52310922e236f85e64524","name":"Matej Pobe\u017eal","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.enseco.sk\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/34f49bd783137c7f1515e9e1b49061506bf355efa9fc1b47eda6181864f6f31e?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/34f49bd783137c7f1515e9e1b49061506bf355efa9fc1b47eda6181864f6f31e?s=96&d=mm&r=g","caption":"Matej Pobe\u017eal"},"url":"https:\/\/www.enseco.sk\/en\/author\/matej\/"}]}},"_links":{"self":[{"href":"https:\/\/www.enseco.sk\/en\/wp-json\/wp\/v2\/posts\/27546","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.enseco.sk\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enseco.sk\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enseco.sk\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enseco.sk\/en\/wp-json\/wp\/v2\/comments?post=27546"}],"version-history":[{"count":8,"href":"https:\/\/www.enseco.sk\/en\/wp-json\/wp\/v2\/posts\/27546\/revisions"}],"predecessor-version":[{"id":30477,"href":"https:\/\/www.enseco.sk\/en\/wp-json\/wp\/v2\/posts\/27546\/revisions\/30477"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enseco.sk\/en\/wp-json\/wp\/v2\/media\/28465"}],"wp:attachment":[{"href":"https:\/\/www.enseco.sk\/en\/wp-json\/wp\/v2\/media?parent=27546"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enseco.sk\/en\/wp-json\/wp\/v2\/categories?post=27546"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enseco.sk\/en\/wp-json\/wp\/v2\/tags?post=27546"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}