Years: 2018 – ongoing
Mochovce
Cable Supporting Systems Welding – Mochovce Nuclear Power Plant
Years: 2018 – ongoing
Mochovce
Provision of Power Supply for Heating, Ventilation and Air Conditioning Units
Years: 2018 – ongoing
Mochovce
Cable Supporting Systems Welding – Mochovce Nuclear Power Plant
Years: 2018 – ongoing
Mochovce
Severe Accidents Management – Long Term Heat Removal System from Hermetic Zone at Mochovce Nuclear Power Plant, Units 1 1. and 2
Year: 2018
Jaslovské Bohunice
Modification of Turbine Accessories during the EBO 3 Shutdown – Welding Works
Year: 2018
Mochovce
SPDS System Repair on the MO12 Simulator
Year: 2018
Mochovce
CRCS Transmission to DISE and ORACLE
Years: 2017 – ongoing
Mochovce
Safety Systems Modernization and Innovation, Mochovce Nuclear Power Plant
Years: 2016 – 2018
Mochovce
Unit’s Information System Signals Transmission, Supplementation of UIS Data Model, Testing for Units 1 1. and 2, Mochovce Nuclear Power Plant
Year: 2016
Mochovce
Signal Transmission Establishment from the Main Condensers of both Turbines (Units 3 and 4) from PLC, located near the Condensers to the Condensate Treatment Control System and from there to BIS and ROVE by means of Optical Connection
Year: 2015
Mochovce
Modification of Transport and Drainage Pumps of the FAK Reactor Shaft
Years: 2014 – 2015
Mochovce
Make-up Pumps Replacement at SE EMO, Units 1 1. and 2
Years: 2014 – 2016
Jaslovské Bohunice
HP Boron Concentrate Make-up Pumps Modification for V2 – Jaslovské Bohunice
Years: 2014 – ongoing
Mochovce
Support for Construction and Coordination of Physical Interfaces, Mochovce Nuclear Power Plant
Year: 2014
Mochovce
Post-warranty Service Repairs of the Unit’s Information and HVAC System
Year: 2014
Mochovce
Pumps Modification for NPP Mochovce, Unit 1
Years: 2013 – 2014
Mochovce
IPR RSE 13003 EMO Part I – Increase of Safety and Reliability of Technological Data Transmission
Years: 2013 – 2016
Mochovce
Post-warranty Repair Service – Units Information System (BIS) and HVAC System
Year: 2012
Mochovce
Investment Project (IPR) no.: 456 – HW and SW Innovation of the Technological (Site) Computer Network and TOPAS System
Year: 2012
Mochovce
Technical Support for Emergency Planning and Preparedness (EPP)
Year: 2012
Mochovce
Investment Project (IPR) no.: 40800 – Completion of Emergency Support Centres
Year: 2011
Mochovce
HW/SW Environment for Transfer of Technological Parameters – Investment Project no.: IPR 464 00
Years: 2010 – 2015
Mochovce
Completion 3. of Units 3&4, NPP Mochovce – Electro Part of the Civil Structures
Year: 2010
Mochovce
Emergency Control Centre Reconstruction – Investment Project: IPR 31 700
Year: 2010
Mochovce
Data Transfer Network Completion for Newly Built Emergency Control Centre of Mochovce NPP – Investment Project no.: IPR RSE 925 05
Years: 2009 – 2010
Mochovce
Technical Support for Emergency Planning and Preparedness (EPP) – Verification of Technological and Radiation Measurements Transfer for the Purposes of ERO (Emergency Response Organization) Application Software – Mochovce NPP
Year: 2009
Mochovce
Expansion of the Main Information System at Mochovce NPP, Units 1 1. and 2
Years: 2008 – 2009
Jaslovské Bohunice
Feasibility Study – Primary Circuit Warming, Units 1 1. Units 1&2
Year: 2008
Jaslovské Bohunice
Emergency Feed Water Supply System –Tests Management at Jaslovské Bohunice NPP – V2 – in the course of the Outage
Year: 2008
Jaslovské Bohunice
Technical Support for the Reconstruction of Jaslovské Bohunice NPP (V1) – Unit 2 – Functional Technological Systems: ECS, FEUR, DG, E6K, ERN
Year: 2008
Jaslovské Bohunice
Automation Systems Replacement – 3. Jaslovské Bohunice NPP, V2 – Units 3&4
Years: 2007 – 2009
Mochovce
Components Examination for Completion of Mochovce NPP, 3. Units 3&4
Year: 2007
Mochovce
KBF Algorithms Completion and Changes regarding SPDS (Safety Parameters Display System) – Mochovce NPP
Year: 2007
Mochovce
Radio-Relay Connection Replacement for Technological Data Transmission within the Emergency Control Centre Situated within the Mochovce NPP Location
Year: 2007
Jaslovské Bohunice
Technical Inspection of Monitored and other Equipment during the General Overhaul in 2007 at Jaslovské Bohunice NPP
Year: 2007
Jaslovské Bohunice
Technical Support and Execution of Electrical and I&C-Part Testing at Jaslovské Bohunice NPP, V2 during the General Overhaul
Year: 2007
Mochovce
Preservation and Protective Works on Technological Equipment – Mochovce NPP, Units 3 ( 3 and 4)
Year: 2007
Jaslovské Bohunice
Automation Systems Replacement – 3. Jaslovské Bohunice NPP, V2 – Units 3&4
Year: 2007
Jaslovské Bohunice
Investment Project no.: IPR JAV02011 – Compressed Air Station
Year: 2007
Jaslovské Bohunice
Electric Systems Repairs at Jaslovské Bohunice NPP, V-1
Year: 2007
Jaslovské Bohunice
110kV Substation Repair – DPS 822.2, Field no. 5,6; Ballast Underlay Repair for 220kV Substation – Jaslovské Bohunice NPP, Unit 1
Year: 2007
Jaslovské Bohunice
Electric Protections Repair within 7 Fields of 110kV Substation – Jaslovské Bohunice NPP, V1
Year: 2006
Jaslovské Bohunice
Repair (Replacement) of Power Supply Switchboards and Faults Indication System – DG 2QV – at Unit 4, Jaslovské Bohunice NPP, V2
Year: 2006
Jaslovské Bohunice
Coordination of Testing Performed on Electrical and I&C Devices at Units 3 3. and 4 within the Scope of the MOD V2 IPR 711
Year: 2006
Mochovce
TG 11 and TG 12 Exciters Repair (Replacement) – Mochovce NPP; Engineering
Year: 2006
Jaslovské Bohunice
Primary and Secondary Circuits’ Automation Systems – Unit 4 (3rd System) and Unit 3 (2nd System), Jaslovské Bohunice NPP, V2
Year: 2006
Jaslovské Bohunice
Engineering – Part of RTIS ROVE SE Project
Years: 2005, 2008
Jaslovské Bohunice
Electro and I&C Tests Control and Coordination 3. Jaslovské Bohunice NPP, V2 – Units 3&4
Years: 2005 – 2006
Mochovce
Engineering – Part of RTIS ROVE Project
Year: 2005
Mochovce
Technical Support during the Technological Network Realization within the Emergency Control Centre and the Standby Emergency Centre – Mochovce NPP
Year: 2005
Mochovce
Clashes regarding the Implementation of the Modernization Task no. B06 – Reconstruction of Pressure Chilled Water Systems
Year: 2005
Mochovce
SW/HW Analysis within the Standby Emergency Centre – Monitoring System Repair at Mochovce NPP
Year: 2005
Jaslovské Bohunice
Pressure Chilled Water Systems Reconstruction at Jaslovské Bohunice NPP, 3. V2 – Units 3&4
Year: 2005
Jaslovské Bohunice
Cable Structures Seismic Reinforcement in the Controlled Area – 3. Jaslovské Bohunice NPP, V2 – Units 3&4
Year: 2005
Jaslovské Bohunice
Replacement of Primary and Secondary Circuits’ Automation Systems – Unit 3,Jaslovské Bohunice NPP, V2
Years: 2004, 2005
Mochovce
Critical Safety Functions Monitoring System Repair in the Emergency Control Centre, System Recovery
Year: 2004
Mochovce
Reconditioning of Electro-Magnetic Components of Technological Computers SICOMP M80, Mochovce NPP, Unit 2
Year: 2004
Mochovce
Hydrogen System Reconstruction – Investment Project no.: IPR 152
Year: 2004
Jaslovské Bohunice
Power Supply Switchboards and Fault Signalling System Repair (Replacement) – 3. DG 1QW,2QX – Jaslovské Bohunice NPP, V2 – Units 3&4
Year: 2004
Jaslovské Bohunice
Primary and Secondary Circuits’ Regulators Reconstruction; 1st Stage – Jaslovské Bohunice NPP, V2
Year: 2004
Jaslovské Bohunice
Hermetic Cable Penetrations Replacement at Jaslovské Bohunice NPP, V2 (Documentation, Coordination, Pre-operational Testing)
Year: 2004
Mochovce
Technical Support during Safety Injection and Residual Heat Removal within the Scope of Pre-operational and Commissioning Testing
Year: 2004
Mochovce
Boric Acid Collecting System in SG (Steam Generator) Box – Mochovce NPP, 1. Units 1&2 (Documentation, Functional Test)
Years: 2003, 2004
Mochovce
Exciters Repair (Replacement)at Turbo Generators no.: 22,21 – Mochovce NPP
Year: 2003
Jaslovské Bohunice
Safety Injection System and Residual Heat Removal System – Jaslovské Bohunice NPP, V2 – Unit 3
Year: 2003
Jaslovské Bohunice
Modification of the Systems: 1,2TB11,12 – Jaslovské Bohunice NPP, 3. V2 – Units 3 and 4
Year: 2003
Jaslovské Bohunice
Replacement of Control, Technological Protection and DC Power Supply Systems of Diesel Generators at Jaslovské Bohunice NPP, 3. V2 – Units 3&4
Year: 2003
Mochovce
Cooperation in Feasibility Study Elaboration Concerning MADAM S System Replacement
Year: 2003
Mochovce
Modification of the Main Control Room HVAC System – Mochovce NPP, 1. Units 1&2 – Detailed Design Development and its Execution
Year: 2003
Jaslovské Bohunice
Pumps’ and Valves’ Automation System Reconstruction in the Central Pumping Station of Jaslovské Bohunice NPP, V-1 – Co-operation in the Project Development
Years: 2002 – 2004
Mochovce
Preservation and Protective Works on Technological Equipment of the Unit 3 – Mochovce NPP, Units 3&4
Years: 2002 – 2003
Mochovce
Water System Operation at the Premises and Repair of Equipment Located within the Premises of Mochovce NPP – Units 3 and 4
Years: 2002 – 2003
Mochovce
Extension of the External Transformers’ Firefighting System – NPP , 1. Units 1&2
Years: 2002 – 2003
Jaslovské Bohunice
Technical Support during Modernization and Safety Increase Programmes Implementation – Jaslovské Bohunice NPP, V-2 (Electro-part Documentation)
Year: 2002
Mochovce
Addition of a Stabile Extinguishing System (water-based) on the Main Coolant Pumps’ Board – Mochovce NPP, Unit 1 – Safety Measures Implementation
Year: 2002
Jaslovské Bohunice
Fire Dampers Replacement at 1. Units 1&2
Year: 2002
Mochovce
Safety Parameters Display System (SPDS) Completion – Safety Measures Implementation
Years: 2001 – 2002
Mochovce
Selected Servomotors, Electromagnets and Valves Replacement at Mochovce NPP, 1. Units 1&2 – Safety Measures Implementation
Years: 2001 – 2002
Mochovce
Post-Accident Monitoring System (PAMS) for 1. Units 1&2 – Mochovce NPP – Cooperation in System Completion
Year: 2001
Mochovce
Technical Support during the Repair of Diesel Generators’ Exciters and Protections at the Mochovce NPP – 1. Units 1&2
Years: 1998 – 1999
Jaslovské Bohunice
Technical Support during Reconstruction of Jaslovské Bohunice NPP 1. – V-1, Units 1&2 in the course of the General Overhaul in: 1999 and 2000 (Works & Documentation)
Year: 1998
Mochovce
Technical Support during Power Start-Up of the Unit 1
Cookie | Duration | Description |
---|---|---|
cookielawinfo-checkbox-analytics | 11 months | Set by the GDPR Cookie Consent plugin, this cookie is used to record the user consent for the cookies in the “Analytics” category. |
cookielawinfo-checkbox-functional | 11 months | The cookie is set by the GDPR Cookie Consent plugin to record the user consent for the cookies in the category “Functional”. |
cookielawinfo-checkbox-necessary | 11 months | Set by the GDPR Cookie Consent plugin, this cookie is used to record the user consent for the cookies in the “Necessary” category. |
cookielawinfo-checkbox-others | 11 months | Set by the GDPR Cookie Consent plugin, this cookie is used to store the user consent for cookies in the category “Others”. |
cookielawinfo-checkbox-performance | 11 months | Set by the GDPR Cookie Consent plugin, this cookie is used to store the user consent for cookies in the category “Performance”. |
viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |
Cookie | Duration | Description |
---|---|---|
_ga | 1 year 1 month 4 days | The _ga cookie, installed by Google Analytics, calculates visitor, session and campaign data and also keeps track of site usage for the site's analytics report. The cookie stores information anonymously and assigns a randomly generated number to recognize unique visitors. |
_ga_* | 1 year 1 month 4 days | Google Analytics sets this cookie to store and count page views. |