Years: 2018 – ongoing
Mochovce
Cable Supporting Systems Welding – Mochovce Nuclear Power Plant
Years: 2018 – ongoing
Mochovce
Provision of Power Supply for Heating, Ventilation and Air Conditioning Units
Years: 2018 – ongoing
Mochovce
Cable Supporting Systems Welding – Mochovce Nuclear Power Plant
Years: 2018 – ongoing
Mochovce
Severe Accidents Management – Long Term Heat Removal System from Hermetic Zone at Mochovce Nuclear Power Plant, Units 1 1. and 2
Year: 2018
Jaslovské Bohunice
Modification of Turbine Accessories during the EBO 3 Shutdown – Welding Works
Year: 2018
Mochovce
SPDS System Repair on the MO12 Simulator
Year: 2018
Mochovce
CRCS Transmission to DISE and ORACLE
Years: 2017 – ongoing
Mochovce
Safety Systems Modernization and Innovation, Mochovce Nuclear Power Plant
Years: 2016 – 2018
Mochovce
Unit’s Information System Signals Transmission, Supplementation of UIS Data Model, Testing for Units 1 1. and 2, Mochovce Nuclear Power Plant
Year: 2016
Mochovce
Signal Transmission Establishment from the Main Condensers of both Turbines (Units 3 and 4) from PLC, located near the Condensers to the Condensate Treatment Control System and from there to BIS and ROVE by means of Optical Connection
Year: 2015
Mochovce
Modification of Transport and Drainage Pumps of the FAK Reactor Shaft
Years: 2014 – 2015
Mochovce
Make-up Pumps Replacement at SE EMO, Units 1 1. and 2
Years: 2014 – 2016
Jaslovské Bohunice
HP Boron Concentrate Make-up Pumps Modification for V2 – Jaslovské Bohunice
Years: 2014 – ongoing
Mochovce
Support for Construction and Coordination of Physical Interfaces, Mochovce Nuclear Power Plant
Year: 2014
Mochovce
Post-warranty Service Repairs of the Unit’s Information and HVAC System
Year: 2014
Mochovce
Pumps Modification for NPP Mochovce, Unit 1
Years: 2013 – 2014
Mochovce
IPR RSE 13003 EMO Part I – Increase of Safety and Reliability of Technological Data Transmission
Years: 2013 – 2016
Mochovce
Post-warranty Repair Service – Units Information System (BIS) and HVAC System
Year: 2012
Mochovce
Investment Project (IPR) no.: 456 – HW and SW Innovation of the Technological (Site) Computer Network and TOPAS System
Year: 2012
Mochovce
Technical Support for Emergency Planning and Preparedness (EPP)
Year: 2012
Mochovce
Investment Project (IPR) no.: 40800 – Completion of Emergency Support Centres
Year: 2011
Mochovce
HW/SW Environment for Transfer of Technological Parameters – Investment Project no.: IPR 464 00
Years: 2010 – 2015
Mochovce
Completion 3. of Units 3&4, NPP Mochovce – Electro Part of the Civil Structures
Year: 2010
Mochovce
Emergency Control Centre Reconstruction – Investment Project: IPR 31 700
Year: 2010
Mochovce
Data Transfer Network Completion for Newly Built Emergency Control Centre of Mochovce NPP – Investment Project no.: IPR RSE 925 05
Years: 2009 – 2010
Mochovce
Technical Support for Emergency Planning and Preparedness (EPP) – Verification of Technological and Radiation Measurements Transfer for the Purposes of ERO (Emergency Response Organization) Application Software – Mochovce NPP
Year: 2009
Mochovce
Expansion of the Main Information System at Mochovce NPP, Units 1 1. and 2
Years: 2008 – 2009
Jaslovské Bohunice
Feasibility Study – Primary Circuit Warming, Units 1 1. Units 1&2
Year: 2008
Jaslovské Bohunice
Emergency Feed Water Supply System –Tests Management at Jaslovské Bohunice NPP – V2 – in the course of the Outage
Year: 2008
Jaslovské Bohunice
Technical Support for the Reconstruction of Jaslovské Bohunice NPP (V1) – Unit 2 – Functional Technological Systems: ECS, FEUR, DG, E6K, ERN
Year: 2008
Jaslovské Bohunice
Automation Systems Replacement – 3. Jaslovské Bohunice NPP, V2 – Units 3&4
Years: 2007 – 2009
Mochovce
Components Examination for Completion of Mochovce NPP, 3. Units 3&4
Year: 2007
Mochovce
KBF Algorithms Completion and Changes regarding SPDS (Safety Parameters Display System) – Mochovce NPP
Year: 2007
Mochovce
Radio-Relay Connection Replacement for Technological Data Transmission within the Emergency Control Centre Situated within the Mochovce NPP Location
Year: 2007
Jaslovské Bohunice
Technical Inspection of Monitored and other Equipment during the General Overhaul in 2007 at Jaslovské Bohunice NPP
Year: 2007
Jaslovské Bohunice
Technical Support and Execution of Electrical and I&C-Part Testing at Jaslovské Bohunice NPP, V2 during the General Overhaul
Year: 2007
Mochovce
Preservation and Protective Works on Technological Equipment – Mochovce NPP, Units 3 ( 3 and 4)
Year: 2007
Jaslovské Bohunice
Automation Systems Replacement – 3. Jaslovské Bohunice NPP, V2 – Units 3&4
Year: 2007
Jaslovské Bohunice
Investment Project no.: IPR JAV02011 – Compressed Air Station
Year: 2007
Jaslovské Bohunice
Electric Systems Repairs at Jaslovské Bohunice NPP, V-1
Year: 2007
Jaslovské Bohunice
110kV Substation Repair – DPS 822.2, Field no. 5,6; Ballast Underlay Repair for 220kV Substation – Jaslovské Bohunice NPP, Unit 1
Year: 2007
Jaslovské Bohunice
Electric Protections Repair within 7 Fields of 110kV Substation – Jaslovské Bohunice NPP, V1
Year: 2006
Jaslovské Bohunice
Repair (Replacement) of Power Supply Switchboards and Faults Indication System – DG 2QV – at Unit 4, Jaslovské Bohunice NPP, V2
Year: 2006
Jaslovské Bohunice
Coordination of Testing Performed on Electrical and I&C Devices at Units 3 3. and 4 within the Scope of the MOD V2 IPR 711
Year: 2006
Mochovce
TG 11 and TG 12 Exciters Repair (Replacement) – Mochovce NPP; Engineering
Year: 2006
Jaslovské Bohunice
Primary and Secondary Circuits’ Automation Systems – Unit 4 (3rd System) and Unit 3 (2nd System), Jaslovské Bohunice NPP, V2
Year: 2006
Jaslovské Bohunice
Engineering – Part of RTIS ROVE SE Project
Years: 2005, 2008
Jaslovské Bohunice
Electro and I&C Tests Control and Coordination 3. Jaslovské Bohunice NPP, V2 – Units 3&4
Years: 2005 – 2006
Mochovce
Engineering – Part of RTIS ROVE Project
Year: 2005
Mochovce
Technical Support during the Technological Network Realization within the Emergency Control Centre and the Standby Emergency Centre – Mochovce NPP
Year: 2005
Mochovce
Clashes regarding the Implementation of the Modernization Task no. B06 – Reconstruction of Pressure Chilled Water Systems
Year: 2005
Mochovce
SW/HW Analysis within the Standby Emergency Centre – Monitoring System Repair at Mochovce NPP
Year: 2005
Jaslovské Bohunice
Pressure Chilled Water Systems Reconstruction at Jaslovské Bohunice NPP, 3. V2 – Units 3&4
Year: 2005
Jaslovské Bohunice
Cable Structures Seismic Reinforcement in the Controlled Area – 3. Jaslovské Bohunice NPP, V2 – Units 3&4
Year: 2005
Jaslovské Bohunice
Replacement of Primary and Secondary Circuits’ Automation Systems – Unit 3,Jaslovské Bohunice NPP, V2
Years: 2004, 2005
Mochovce
Critical Safety Functions Monitoring System Repair in the Emergency Control Centre, System Recovery
Year: 2004
Mochovce
Reconditioning of Electro-Magnetic Components of Technological Computers SICOMP M80, Mochovce NPP, Unit 2
Year: 2004
Mochovce
Hydrogen System Reconstruction – Investment Project no.: IPR 152
Year: 2004
Jaslovské Bohunice
Power Supply Switchboards and Fault Signalling System Repair (Replacement) – 3. DG 1QW,2QX – Jaslovské Bohunice NPP, V2 – Units 3&4
Year: 2004
Jaslovské Bohunice
Primary and Secondary Circuits’ Regulators Reconstruction; 1st Stage – Jaslovské Bohunice NPP, V2
Year: 2004
Jaslovské Bohunice
Hermetic Cable Penetrations Replacement at Jaslovské Bohunice NPP, V2 (Documentation, Coordination, Pre-operational Testing)
Year: 2004
Mochovce
Technical Support during Safety Injection and Residual Heat Removal within the Scope of Pre-operational and Commissioning Testing
Year: 2004
Mochovce
Boric Acid Collecting System in SG (Steam Generator) Box – Mochovce NPP, 1. Units 1&2 (Documentation, Functional Test)
Years: 2003, 2004
Mochovce
Exciters Repair (Replacement)at Turbo Generators no.: 22,21 – Mochovce NPP
Year: 2003
Jaslovské Bohunice
Safety Injection System and Residual Heat Removal System – Jaslovské Bohunice NPP, V2 – Unit 3
Year: 2003
Jaslovské Bohunice
Modification of the Systems: 1,2TB11,12 – Jaslovské Bohunice NPP, 3. V2 – Units 3 and 4
Year: 2003
Jaslovské Bohunice
Replacement of Control, Technological Protection and DC Power Supply Systems of Diesel Generators at Jaslovské Bohunice NPP, 3. V2 – Units 3&4
Year: 2003
Mochovce
Cooperation in Feasibility Study Elaboration Concerning MADAM S System Replacement
Year: 2003
Mochovce
Modification of the Main Control Room HVAC System – Mochovce NPP, 1. Units 1&2 – Detailed Design Development and its Execution
Year: 2003
Jaslovské Bohunice
Pumps’ and Valves’ Automation System Reconstruction in the Central Pumping Station of Jaslovské Bohunice NPP, V-1 – Co-operation in the Project Development
Years: 2002 – 2004
Mochovce
Preservation and Protective Works on Technological Equipment of the Unit 3 – Mochovce NPP, Units 3&4
Years: 2002 – 2003
Mochovce
Water System Operation at the Premises and Repair of Equipment Located within the Premises of Mochovce NPP – Units 3 and 4
Years: 2002 – 2003
Mochovce
Extension of the External Transformers’ Firefighting System – NPP , 1. Units 1&2
Years: 2002 – 2003
Jaslovské Bohunice
Technical Support during Modernization and Safety Increase Programmes Implementation – Jaslovské Bohunice NPP, V-2 (Electro-part Documentation)
Year: 2002
Mochovce
Addition of a Stabile Extinguishing System (water-based) on the Main Coolant Pumps’ Board – Mochovce NPP, Unit 1 – Safety Measures Implementation
Year: 2002
Jaslovské Bohunice
Fire Dampers Replacement at 1. Units 1&2
Year: 2002
Mochovce
Safety Parameters Display System (SPDS) Completion – Safety Measures Implementation
Years: 2001 – 2002
Mochovce
Selected Servomotors, Electromagnets and Valves Replacement at Mochovce NPP, 1. Units 1&2 – Safety Measures Implementation
Years: 2001 – 2002
Mochovce
Post-Accident Monitoring System (PAMS) for 1. Units 1&2 – Mochovce NPP – Cooperation in System Completion
Year: 2001
Mochovce
Technical Support during the Repair of Diesel Generators’ Exciters and Protections at the Mochovce NPP – 1. Units 1&2
Years: 1998 – 1999
Jaslovské Bohunice
Technical Support during Reconstruction of Jaslovské Bohunice NPP 1. – V-1, Units 1&2 in the course of the General Overhaul in: 1999 and 2000 (Works & Documentation)
Year: 1998
Mochovce
Technical Support during Power Start-Up of the Unit 1