Slovenské Elektrárne, a. s.

(2009 – ONGOING) Mochovce NPP, MO34

Completion of Mochovce NPP, Units 3&4 – Technological Part

(2010 – 2024) Mochovce NPP, MO34

Completion of Mochovce NPP, Units 3&4 – Civil Electrical Part

(2021 – 2024) NPP Jaslovské Bohunice V2

Modification of Power Supply of TC10,50 Valves

(2024 – ONGOING) Mochovce NPP

Replacing DIWA Servers Including Software

(2025 – ONGOING) Mochovce NPP

Service of BIS, RISSD, ROVE, TPS Systems, HRS Database Servers and Wepas, Webpas Applications

(2025 – ONGOING) Jaslovská Bohunice NPP

Modification in the Waste Water Node at EBO

(2025 – ONGOING) Mochovce NPP

Execution of Repairs of Computing and Automation Technology

(2025) Jaslovské Bohunice NPP

Replacement of the ADVANTECH Monitoring System in the Common Control Room

(2025) Mochovce NPP, MO3

Preparation of 4 Hydroaccumulators During the Outage of Unit 1 (RGO1/25) and 4 Units During the Outage of Unit 3 (RGO3/25) in 2025 for NDT – Non-Destructive Tesing (PT, VT, LT) of Hydroaccumulators

(2024 – ONGOING) Mochovce NPP, MO4

Execution of Lighting Tests on the Conventional Island (CI) of Unit 4

(2024 – ONGOING) Mochovce NPP

Modification of Heterogeneous Welds in the Node of 1. Steam Generators on the EMO, Units 1&2 up to DN90 – Execution

(2024) Jaslovské Bohunice NPP

Preparation of Hydraulic Accumulators (4 Units) for NDT – Non-destructive Testing (PT – Pressure Testing, VT – Internal inspection, LT – Leak Testing) and General Overhaul of 4 pcs of Check Valves TP 350 Type FAeS DN250 on Unit 4 and 4 pcs of Check Valves TP 350 Type FAes DN 250

(2023) Jaslovské Bohunice NPP

Non-destructive Testing (NDT), Pressure Testing, Internal Inspection, and Leak Testing of 4 Hydraulic Accumulators

(2019 – 2022) Mochovce NPP, MO34

Testing and Measurement of Lighting Intensity – Conventional Island

(2023 – 2025) Mochovce NPP

Replacement of Valves for Emergency H2 Bleeding

(2023 – 2024) Jaslovské Bohunice NPP

Modification of the Demineralized Water Pumps’ Automation Systems

(2023 – 2025) Mochovce NPP

Replacement of Non-System Switchboards’ Circuit Breakers

(2023 – 2024) Jaslovské Bohunice NPP

Power Supply of Ventilation Fans

(2022 – ONGOING) Mochovce NPP

Repairs of Computing and Automation Technology

(2022 – ONGOING) Mochovce NPP

Post-Installation Cleaning Operations, Preservations, and Maintenance Activities

(2022 – ONGOING) Jaslovské Bohunice NPP/Mochovce NPP

Performance of Locksmith, Welding, and Assembly Work and Related Activities to the Extent Necessary for Repairs and Revisions of Valves

(2021 – ONGOING) Jaslovské Bohunice NPP V2

Modification of Heterogeneous Welds in the Node of Steam Generators – Installation of Intermediate Pieces in Pipelines at SG

(2021 – 2024) MO34, Mochovce NPP

Design, Supply and Erection of Remaining Electrical Works for Lighting, Earthing and Lightning in Conventional Island of Unit 4 and Completion and Issuance of As Built Documentation for Conventional Island of Unit 3 and Unit 4

(2021 – 2024) MO12, Mochovce NPP

Service of BIS, RISSD, ROVE, TPS Systems, HRS Database Servers and Wepas, Webpas Applications

(2020 – 2024) Jaslovské Bohunice NPP/ Mochovce NPP

Modification of Transformers‘ Position Switches

(2020 – 2024) V2 Jaslovské Bohunice NPP

Replacement of Devices in Outlets for Direct Oil Pumps in 1ED, 1ED11, 2ED, 2ED11 at EBO V2

(2019 – ONGOING) MO34 Mochovce NPP

Mechanical Completion of the Diesel Generator Plant at Unit 4, Mochovce NPP

(2019 – ONGOING) MO34 Mochovce NPP

Condensate Treatment System and Chemicals Feeding (Technological Part)

(2019 – 2024) MO34, Mochovce NPP

Completion of Electrical Systems in the CS of the Conventional Part of Unit 3 and the Priority Rooms of Unit 4

(2019 – ONGOING) MO34 Mochovce NPP

Thermal Insulation Works for Piping and Equipment at the Conventional Part of MO34

(2019 – ONGOING) MO34 Mochovce NPP

Refurbishment of Valves

(2023) Jaslovské Bohunice NPP

Non-destructive Testing (NDT), Pressure Testing, Internal Inspection, and Leak Testing of 4 Hydraulic Accumulators

(2022) Mochovce NPP

Installation of Control Valves – Condensate Treatment System

(2021 – 2022) Jaslovské Bohunice NPP

Elaboration of the Protocol on the Environmental Impacts Assessment for CS 350/V2 Grooves and Channels of Power Cables

(2021 – 2022) Jaslovské Bohunice NPP/ Mochovce NPP

Preparation of Project Documentation for Electrical Part and I&C

(2020) Jaslovské Bohunice NPP V2

Replacement of Pressure Valves in the DG Node

(2020) MO12, Mochovce NPP

Repair of the BIS Simulator Server at EMO 12

(2020) Together at Jaslovské Bohunice NPP V2 and MO12, Mochovce NPP

Replacement of Relay KU21

(2019 – 2022) Mochovce NPP, MO12

Welding and Locksmith Work when Replacing Components in the Primary and Secondary Circuit at the Mochovce NPP

(2019) MO12, Mochovce NPP

Linking MO34 Data with the WEPAS EMO12 System

(2019) MO12, Mochovce NPP

Repair of the Teleperm ME – BIS Interface

(2018 – 2021) Mochovce NPP, MO12

Post-Warranty Repairs of BIS and RISSD

(2018) Mochovce NPP, MO12

Repair of Data Transfer between SAM I&C – Oracle EMO12

(2018) Mochovce NPP

SPDS System Repair on the MO12 Simulator

(2016) Mochovce NPP

Signal Transmission Establishment from the Main Condensers of both Turbines (Units 3 and 4) from PLC, located near the Condensers to the Condensate Treatment Control System and from there to BIS and ROVE by means of Optical Connection

(2015) Mochovce NPP

Make-up Pumps Replacement at MO12

Modification of Transport and Drainage Pumps of the FAK Reactor Shaft

(2014 – 2020) Mochovce NPP

Artificial Lighting and Heavy-current Distribution Systems, Lightning Conductor and Earthing at CS 801/1-02, Units 3&4

Designing, supplying, engineering, coordination, installation, tests, commissioning of the artificial lighting and heavy-current distribution systems

(2014 – 2016) Jaslovské Bohunice NPP

HP Boron Concentrate Make-up Pumps Modification for V2

(2014) Mochovce NPP

Pumps Modification Unit 1

Post-warranty Service Repairs of the Unit’s Information and HVAC System

(2013 – 2016) Mochovce NPP

Post-warranty Repair Service – Units Information System (BIS) and HVAC System

(2013 – 2014) Mochovce NPP

Increase of Safety and Reliability of Technological Data Transmission

(2012) Mochovce NPP

Completion of Emergency Support Centres

Technical support for Emergency Planning and Preparedness
Innovation of the hardware and software of the technological computer network and the TOPAS system

(2010) Jaslovské Bohunice NPP

Units’ Power Output Increase

Technical assistance within the scope of: Management of functional tests during the general overhaul.
  • Management of pre-operational testing (POT) and commissioning testing (CT) in the course of the general overhaul
  • Management of pre-operational testing (POT) and commissioning testing (CT) in the course of the units start-up and physical & power escalation tests
  • Provision of organizational managers of POT and CT
  • Management of the agenda for tests control and performance
  • Completion and evaluation of the documentation necessary for POT and CT initiation; and
  • Cooperation coordination of the operation, administration and maintenance departments of SE EBO and individual supplying organizations (contractors) during test preparation
(2010) Mochovce NPP

Emergency Control Centre Reconstruction

(2009 – 2010) Mochovce NPP

Technical Support for Emergency Planning and Preparedness (EPP) – Verification of Technological and Radiation Measurements Transfer for the Purposes of ERO (Emergency Response Organization) Application Software – Mochovce NPP

(2008) Jaslovské Bohunice NPP

Total Units’ Power Output Increase, MOD Project – Jaslovské Bohunice NPP – Works Coordination

Provision of engineering activities for the project “Total Units’ Power Output Increase”

Coordination of works between maintenance division and individual contractors for ELECTRO and I&C Project-parts; coordination and control of functional tests; coordination and control of tests in compliance with POT (pre-operational testing) and CT (commissioning testing) programmes; Inspection of DD with reference to the generator G41 modification and replacement of measuring nozzles at 3. Units 3&4.

Emergency Feed Water Supply System –Tests Management at Jaslovské Bohunice NPP – V2 – in the course of the Outage

Feasibility Study – Primary Circuit Warming, Units 1&2

(2007) Mochovce NPP

Radio-Relay Connection Replacement for Technological Data Transmission within the Emergency Control Centre Situated within the Mochovce NPP Location

Addition and modification of KBF algorithms in the SPDS systemVerification of components for the completion of MO34

(2006) Jaslovské Bohunice NPP

Repair (Replacement) of Power Supply Switchboards and Faults Indication System – DG 2QV – at Unit 4, Jaslovské Bohunice NPP, V2

(2006 – 2009) Mochovce NPP

MADAM S Information System Top Level Replacement – Units 1&2

Vypracovanie a odovzdanie realizačnej projektovej dokumentácie pre bloky 1&2

Simulator of technological activities progress, supply of hardware for Units 1&2 and for the simulator; delivery of the respective software for: data collection, communication with environment and data visualization & archiving; execution of works associated with hardware installation and recovery; performance of works associated with SW installation; elaboration and submission of Pre-operational testing Programmes, Commissioning Testing Programmes and SW validation programmes. Elaboration and submission of the Quality Plan; System commissioning; Trial test run; Elaboration and submission of the Quality Plan; System commissioning; Trial test run; Elaboration and submission of: the Operating Instructions for the system operation, system and user documentation, Operating instructions, as-is documentation and accompanying technical documentation; Operating instructions, as-is documentation and accompanying technical documentation; Provision of user licenses for all supplied products.

(2005) Mochovce NPP

SW/HW Analysis within the Standby Emergency Centre – Monitoring System Repair at Mochovce NPP

Reconstruction of pressure systems – cooled water
Technical support for the application of technological networks in the Emergency Centre and Standby Emergency Centre

(2005) Jaslovské Bohunice NPP

Cable Structures Seismic Reinforcement in the Controlled Area – Units 3&4, V2

Pressure Chilled Water Systems Reconstruction at V2 – Units 3&4

(2004 – 2007) Jaslovské Bohunice NPP

Increase of Nuclear Safety and Seismic Resistance of Jaslovské Bohunice NPP V2; Modernization of the Essential Service Water (ÚM 09.00 TVD) & Control Rooms (ÚM V01 Control Rooms)

Increase of Nuclear Safety and Seismic Resistance of Jaslovské Bohunice NPP V2, G7.

Control and coordination of tests regarding ELECTRO and I&C parts; technical inspection of the monitored equipment performed during general overhaul of Units 3 and 4 in 2008 (general overhaul of Units 3&4/2008) at Slovenské elektrárne, a. s. – plant: Bohunice NPP within the following scope:

  • Management of pre-operational testing (POT) and commissioning testing (CT)
  • Provision of organizational managers of POT and CT
  • Management of the agenda for tests control and performance
  • Inspection of the accompanying technical documentation concerning the manufacturing stage and inspection of individual activities in terms of IQAP (Individual Assurance Quality Programme)
  • Completion and evaluation of the documentation necessary for POT and CT initiation; and
  • Cooperation coordination between the operation, administration and maintenance departments of SE EBO and individual contractors (supplying organizations) during POT and CT tests preparation
  • Technical inspection of the monitored and other equipment performed in the course of MOD (Modernization) projects at V2 regarding the civil, mechanical, electro and I&C Project-parts within the scope of modernization tasks that took place during the general overhaul of Units 3&4 (2008).
(2004) Mochovce NPP

Reconditioning of Electro-Magnetic Components of Technological Computers SICOMP M80, Mochovce NPP, Unit 2

Critical Safety Functions Monitoring System Repair in the Emergency Control Centre, System Recovery

(2003) Jaslovské Bohunice NPP

Replacement of Control, Technological Protection and DC Power Supply Systems of Diesel Generators at V2, Units 3&4

Modification of the Systems: 1,2TB11,12 – V2, Units 3&4
Emergency make-up and residual heat removal system – V2, Unit 3
Replacement repair of power switchboards and fault indication system DG 1QW,2QX – V2, Units 3&4

(2002 – 2003) Mochovce NPP

Water System Operation at the Premises and Repair of Equipment Located within the Premises of Mochovce NPP – Units 3 and 4

Extension of the External Transformers’ Firefighting System – Units 1&2 – Execution of a safety measure: Preservation and protection activities on process equipment of the construction.

(2002) Jaslovské Bohunice NPP

Fire Dampers Replacement at Units 1&2

(2002) Mochovce NPP

Safety Parameters Display System (SPDS) Completion – Safety Measures Implementation

Addition of a Stabile Extinguishing System (water-based) on the Main Coolant Pumps’ Board – Mochovce NPP, Safety Measures Implementation

(2001 – 2002) Mochovce NPP

Selected Servomotors, Electromagnets and Valves Replacement at MO12 – Safety Measures Implementation

(2000) Nováky

Technical Support during the Reconstruction of the Turbine Generator and its Accessories – Nováky PP, Unit 4

Technical support during the turbine generator (TG) reconstruction:
  • Machinery technology (elaboration of time schedules, coordination and control of assembly, construction tests, pressure tests, post-installation cleaning operations, control and performance of POT (pre-operational testing) and CT (commissioning testing), protocol-based evaluation)
  • Instrumentation and Control (coordination and control of disassembly & assembly – TG turbine hall, static exciter set, hydrogen system, inspection of the measuring circuits incl. the respective SW, tests of protections and blockades, control and performance of POT and CT, RP (radiation protection) optimization)
  • Electro-part (civil readiness, design documentation, project of excitation transformer protection, assembly procedure, setting, testing of the excitation transformer protections, testing of couplings, inspection of current and voltage circuits of protections and measurements after cabling replacement, preparation for and performance of primary tests incl. phases linkage into the electric network, organization of tests regarding the turbine operation – into the power system; POT and CT programmes
Scroll to Top