(2009 – ONGOING) MO34 Mochovce NPP
Completion of Mochovce NPP, Units 3&4 – Technological Part
(2009 – ONGOING) MO34 Mochovce NPP
Completion of Mochovce NPP, Units 3 and 4 – Civil Electrical Part
(2018 – ONGOING) Mochovce NPP
IPR M20049 – Replacement of Valves for Emergency H2 Bleeding
(2023 – ONGOING) Jaslovské Bohunice NPP
IPR B20013 – Modification of the Demineralized Water Pumps’ Automation Systems
(2022 – ONGOING) Mochovce NPP
IPR M20058 – Replacement of Non-System Switchboards’ Circuit Breakers
(2022 – ONGOING) Jaslovské Bohunice NPP
B2001 -Power Supply of Ventilation Fans
(2022 – ONGOING) Mochovce NPP
Repairs of Computing and Automation Technology in SE-EMO
(2022 – ONGOING) Mochovce NPP
M1316 – Post-Installation Cleaning Operations, Preservations and Maintanence Activities
(2022 – ONGOING) Jaslovské Bohunice NPP/Mochovce NPP
Performance of Locksmith, Welding and Assembly Work and Related Activities to the Extent Necessary for Repairs and Revisions of Valves for SE EBO and EMO
(2021 – ONGOING) Jaslovské Bohunice NPP V2
Modification of Heterogeneous Welds in the Node of Steam Generators on the EBO V2 NPP Units 3&4 – Installation of Intermediate Pieces in Pipelines at SG.
(2021 – 2024) Jaslovské Bohunice NPP V2
Modification of Power Supply of TC10,50 Valves
(2021 – ONGOING) MO34 Mochovce NPP
2E1265 – Design, Supply and Erection of Remaining Electrical Works for Lighting, Earthing and Lightning in Conventional Island of Unit 4 and Completion and Issuance of As Built Documentation for Conventional Island of
(2021 – ONGOING) MO12, Mochovce NPP
Service of BIS, RISSD, ROVE, TPS Systems, HRS Database Servers and Wepas, Webpas Applications
(2020 – ONGOING) Jaslovské Bohunice NPP/Mochovce NPP
Modification of Transformers‘ Position Switches at EMO12 & EBO V2
(2020 – ONGOING) Jaslovské Bohunice NPP V2
Replacement of Devices in Outlets for Direct Oil Pumps in 1ED, 1ED11, 2ED, 2ED11 at EBO V2
(2019 – ONGOING) MO34 Mochovce NPP
Mechanical Completion of the Diesel Generator Plant at Unit 4, Mochovce NPP
(2019 – ONGOING) MO34 Mochovce NPP
Condensate Treatment System and Chemicals Feeding at Units 3 and 4, Mochovce NPP (Technological Part)
(2019 – ONGOING) MO34 Mochovce NPP
Job C027 – Completion of Electrical Systems in the CS of the Conventional Part of Unit 3 and the Priority Rooms of Unit 4, Mochovce NPP
(2019 – ONGOING) MO34 Mochovce NPP
Thermal Insulation Works for Piping and Equipment at the Conventional Part of MO34
(2018 – ONGOING) MO34 Mochovce NPP
M74 – Refurbishment of Valves
(2023) Jaslovské Bohunice NPP
Nondestructive Testing (NDT), Pressure Test (PT), Internal Inspection and Leak Test of 4 (four) Hydroaccumulators at EBO
(2022) Mochovce NPP
Installation of Control Valves – Condensate Treatment System
(2021-2022) Jaslovské Bohunice NPP
Elaboration of the Protocol on the Environmental Impacts Assessment for CS 350/V2 Grooves and Channels of Power Cables
(2021-2022) Jaslovské Bohunice NPP/Mochovce NPP
Preparation of the Project Documentation for the Electro and I&C Part for EBO and EMO12
(2020) Jaslovskaé Bohunice NPP V2
Replacement of Pressure Valves in the DG Node at SE-EBO
(2020) MO12, Mochovce NPP
Repair of the BIS Simulator Server at EMO 12
(2020) Together at Jaslovské Bohunice NPP V2 and MO12, Mochovce NPP
IPR M19058 Replacement of Relay KU21 for EMO, EBO
(2019-2022) MO12, Mochovce NPP
Welding and Locksmith Work when Replacing Components in the Primary and Secondary Circuit at the Mochovce NPP
(2019) MO12, Mochovce NPP
Linking MO34 Data with the WEPAS EMO12 System
(2019) MO12, Mochovce NPP
Repair of the Teleperm ME – BIS Interface
(2018-2021) MO12, Mochovce NPP
Post-Warranty Repairs of BIS and RISSD
(2018) MO12, Mochovce NPP
Repair of Data Transfer between SAM I&C – Oracle EMO12
(2018) Mochovce
SPDS System Repair on the MO12 Simulator
(2016) Mochovce
Signal Transmission Establishment from the Main Condensers of both Turbines (Units 3 and 4) from PLC, located near the Condensers to the Condensate Treatment Control System and from there to BIS and ROVE by means of Optical Connection
(2015) Mochovce
Make-up Pumps Replacement at SE EMO, Units 1 and 2
Modification of Transport and Drainage Pumps of the FAK Reactor Shaft
(2014 – 2020) Mochovce
Artificial Lighting and Heavy-current Distribution Systems, Lightning Conductor and Earthing at CS 801/1-02, Units 3 and 4
Designing, supplying, engineering, coordination, installation, tests, commissioning of the artificial lighting and heavy-current distribution systems
(2014 – 2016) Jaslovské Bohunice
HP Boron Concentrate Make-up Pumps Modification for V2 – Jaslovské Bohunice
(2014) Mochovce
Pumps Modification for NPP Mochovce, Unit 1
Post-warranty Service Repairs of the Unit’s Information and HVAC System
(2013 – 2016) Mochovce
Post-warranty Repair Service – Units Information System (BIS) and HVAC System
(2013 – 2014) Mochovce
IPR RSE 13003 EMO Part I – Increase of Safety and Reliability of Technological Data Transmission
(2012) Mochovce
Investment Project (IPR) no.: 40800 – Completion of Emergency Support Centres
Technical Support for Emergency Planning and Preparedness (EPP)
Investment Project (IPR) no.: 456 – HW and SW Innovation of the Technological (Site) Computer Network and TOPAS System
(2010) Jaslovské Bohunice
EBO 9000 – Units’ Power Output Increase at Jaslovské Bohunice NPP, V2
Investment Project: IPR EBO 90000 – Technical support in the scope of: Management of functional tests in the course of the general overhaul performance
- Management of pre-operational testing (POT) and commissioning testing (CT) in the course of the general overhaul
- Management of pre-operational testing (POT) and commissioning testing (CT) in the course of the units start-up and physical & power escalation tests
- Provision of organizational managers of POT and CT
- Management of the agenda for tests control and performance
- Completion and evaluation of the documentation necessary for POT and CT initiation; and
- Cooperation coordination of the operation, administration and maintenance departments of SE EBO and individual supplying organizations (contractors) during test preparation
(2010) Mochovce
Emergency Control Centre Reconstruction – Investment Project: IPR 31 700
(2009 – 2010) Mochovce
Technical Support for Emergency Planning and Preparedness (EPP) – Verification of Technological and Radiation Measurements Transfer for the Purposes of ERO (Emergency Response Organization) Application Software – Mochovce NPP
(2008) Jaslovské Bohunice
Total Units’ Power Output Increase, MOD Project – Jaslovské Bohunice NPP – Works Coordination
Investment Project – IPR 90000 – V2 – Provision of engineering activities for the project: “Increase of total units’ power output”
coordination of works between maintenance division and individual contractors for ELECTRO and I&C Project-parts; coordination and control of functional tests; coordination and control of tests in compliance with POT (pre-operational testing) and CT (commissioning testing) programmes; Inspection of DD with reference to the generator G41 modification and replacement of measuring nozzles at Units 3&4.
Emergency Feed Water Supply System –Tests Management at Jaslovské Bohunice NPP – V2 – in the course of the Outage
Feasibility Study – Primary Circuit Warming, Units 1 Units 1&2
(2007) Mochovce
Radio-Relay Connection Replacement for Technological Data Transmission within the Emergency Control Centre Situated within the Mochovce NPP Location
KBF Algorithms Completion and Changes regarding SPDS (Safety Parameters Display System) – Mochovce NPP
Components Examination for Completion of Mochovce NPP, Units 3&4
(2006) Jaslovské Bohunice
Repair (Replacement) of Power Supply Switchboards and Faults Indication System – DG 2QV – at Unit 4, Jaslovské Bohunice NPP, V2
(2006 – 2009) Mochovce
MADAM S Information System Top Level Replacement – Units 1&2 JE Mochovce
Elaboration and submission of the detail design documentation for Units 1 and 2
and for the simulator of technological activities progress supply of hardware for Units 1&2 and for the simulator; delivery of the respective software for: data collection, communication with environment and data visualization & archiving; execution of works associated with hardware installation and recovery; performance of works associated with SW installation; elaboration and submission of Pre-operational testing Programmes, Commissioning Testing Programmes and SW validation programmes; Elaboration and submission of the Quality Plan; system commissioning; trial test run; Elaboration and submission of: the Operating Instructions for the system operation, system and user documentation, operating instructions, as-is documentation and accompanying technical documentation; Provision of user licenses for all supplied products
(2005) Mochovce
SW/HW Analysis within the Standby Emergency Centre – Monitoring System Repair at Mochovce NPP
Clashes regarding the Implementation of the Modernization Task no. B06 – Reconstruction of Pressure Chilled Water Systems
Technical Support during the Technological Network Realization within the Emergency Control Centre and the Standby Emergency Centre – Mochovce NPP
(2005) Jaslovské Bohunice
Cable Structures Seismic Reinforcement in the Controlled Area – Jaslovské Bohunice NPP, V2 – Units 3&4
Pressure Chilled Water Systems Reconstruction at Jaslovské Bohunice NPP, V2 – Units 3&4
(2004 – 2007) Jaslovské Bohunice
Increase of Nuclear Safety and Seismic Resistance of Jaslovské Bohunice NPP V2; Modernization of the Essential Service Water (ÚM 09.00 TVD) & Control Rooms (ÚM V01 Control Rooms)
Job no. 711 – increase of nuclear safety and seismic resistance at the Jaslovské Bohunice NPP – V2, G7 –
control and coordination of tests regarding ELECTRO and I&C parts; technical inspection of the monitored equipment performed during general overhaul of Units 3 and 4 in 2008 (general overhaul of Units 3&4/2008) at Slovenské elektrárne, a. s. – plant: Bohunice NPP within the following scope:
- Management of pre-operational testing (POT) and commissioning testing (CT)
- Provision of organizational managers of POT and CT
- Management of the agenda for tests control and performance
- Inspection of the accompanying technical documentation concerning the manufacturing stage and inspection of individual activities in terms of IQAP (Individual Assurance Quality Programme)
- Completion and evaluation of the documentation necessary for POT and CT initiation; and
- Cooperation coordination between the operation, administration and maintenance departments of SE EBO and individual contractors (supplying organizations) during POT and CT tests preparation
- Technical inspection of the monitored and other equipment performed in the course of MOD (Modernization) projects at V2 regarding the civil, mechanical, electro and I&C Project-parts within the scope of modernization tasks that took place during the general overhaul of Units 3&4 (2008)
(2004) Mochovce
Reconditioning of Electro-Magnetic Components of Technological Computers SICOMP M80, Mochovce NPP, Unit 2
Critical Safety Functions Monitoring System Repair in the Emergency Control Centre, System Recovery
(2003) Jaslovské Bohunice
Replacement of Control, Technological Protection and DC Power Supply Systems of Diesel Generators at Jaslovské Bohunice NPP, V2 – Units 3&4
Modification of the Systems: 1,2TB11,12 – Jaslovské Bohunice NPP, V2 – Units 3 and 4
Safety Injection System and Residual Heat Removal System – Jaslovské Bohunice NPP, V2 – Unit 3
Power Supply Switchboards and Fault Signalling System Repair (Replacement) – DG 1QW,2QX – Jaslovské Bohunice NPP, V2 – Units 3&4
(2002-2003) Mochovce
Water System Operation at the Premises and Repair of Equipment Located within the Premises of Mochovce NPP – Units 3 and 4
Extension of the External Transformers’ Firefighting System – NPP , Units 1&2
Preservation and Protective Works on Technological Equipment of the Unit 3 – Mochovce NPP, Units 3&4
(2002) Jaslovské Bohunice
Fire Dampers Replacement at Units 1&2
(2002) Mochovce
Safety Parameters Display System (SPDS) Completion – Safety Measures Implementation
Addition of a Stabile Extinguishing System (water-based) on the Main Coolant Pumps’ Board – Mochovce NPP, Unit 1 – Safety Measures Implementation
(2001 – 2002) Mochovce
Selected Servomotors, Electromagnets and Valves Replacement at Mochovce NPP, Units 1&2 – Safety Measures Implementation
(2000) Nováky
Technical Support during the Reconstruction of the Turbine Generator and its Accessories – Nováky NPP, Unit 4
Technical support during the turbine generator (TG) reconstruction:
- Machinery technology (elaboration of time schedules, coordination and control of assembly, construction tests, pressure tests, post-installation cleaning operations, control and performance of POT (pre-operational testing) and CT (commissioning testing), protocol-based evaluation)
- Instrumentation and Control (coordination and control of disassembly & assembly – TG turbine hall, static exciter set, hydrogen system, inspection of the measuring circuits incl. the respective SW, tests of protections and blockades, control and performance of POT and CT, RP (radiation protection) optimization)
- Electro-part (civil readiness, design documentation, project of excitation transformer protection, assembly procedure, setting, testing of the excitation transformer protections, testing of couplings, inspection of current and voltage circuits of protections and measurements after cabling replacement, preparation for and performance of primary tests incl. phases linkage into the electric network, organization of tests regarding the turbine operation – into the power system; POT and CT programmes