PPA CONTROLL, a. s.

(2008) Jaslovské Bohunice NPP

Automation Systems Replacement – 3. and Unit 4 at V2 NPP – PPA ENERGO, s. r. o.

Design, delivery, engineering, coordination, assembly, testing…

(2007) Jaslovské Bohunice

Automation Systems Replacement – 3. and Unit 4 at V2 NPP – PPA ENERGO, s. r. o.

Design, delivery, engineering, coordination, assembly, testing…

(2003) Jaslovské Bohunice NPP

Pumps’ and Valves’ Automation System Reconstruction in the Central Pumping Station of Jaslovské Bohunice NPP, V-1 – Co-operation in the Project Development

Scroll to Top