Years: 2010 – 2012
Mochovce
Replacement of the Top Level regarding the Control and Information System for HVAC and Auxiliary Systems – Mochovce NPP, 1. Units 1&2; Investment Project no.: IPR EMO 25 100
Years: 2014 – ongoing
Mochovce
Artificial Lighting and Heavy-current Distribution Systems, Lightning Conductor and Earthing at CS 801/1-02, 3. and 4
Designing, supplying, engineering, coordination, installation, tests, commissioning of the artificial lighting and heavy-current distribution systems
Years: 2010 – 2012
Mochovce
Replacement of the Top Level regarding the Control and Information System for HVAC and Auxiliary Systems – Mochovce NPP, 1. Units 1&2; Investment Project no.: IPR EMO 25 100
Supplying, installation, tests and as-built documentation block – delivery, assembly, tests, documentation of the actual design.
Year: 2010
Jaslovské Bohunice
EBO 9000 – Units’ Power Output Increase at Jaslovské Bohunice NPP, V2
Investment Project: IPR EBO 90000 – Technical support in the scope of: Management of functional tests in the course of the general overhaul performance
Years: 2009 – Ongoing
Mochovce
Completion 3. Units 3&4 – Design, Delivery, Assembly and Tests of the Respective Elementary Systems
Elaboration of the detail design documentation; provision of deliveries; assembly/installation; performance of tests (PICO – Post-Installation Cleaning Operations, POT – Pre-Operational Testing, CT – Commissioning Testing) of elementary systems at Mochovce NPP: PS 03,11,14 and 54; including: quality assurance and quality control documentation; accompanying technical documentation; time schedules; documents concerning safety and health protection introduced within STC (Safety and Technical Conditions of Performance) and provision of all other materials, works and services concerning the Unit 3 and common systems of the Units 3 &4.
Year: 2008
Jaslovské Bohunice
Total Units’ Power Output Increase, MOD Project – Jaslovské Bohunice NPP – Works Coordination
Investment Project – IPR 90000 – V2 – Provision of engineering activities for the project: “Increase of total units’ power output”: coordination of works between maintenance division and individual contractors for ELECTRO and I&C Project-parts; coordination and control of functional tests; coordination and control of tests in compliance with POT (pre-operational testing) and CT (commissioning testing) programmes; Inspection of DD with reference to the generator G41 modification and replacement of measuring nozzles at NPP V2, 3. Units 3&4.
Years: 2006 – 2009
Mochovce
MADAM S Information System Top Level Replacement – 1. Mochovce NPP, Units 1 and 2
Years: 2004 – 2007
Jaslovské Bohunice
Increase of Nuclear Safety and Seismic Resistance of Jaslovské Bohunice NPP V2; Modernization of the Essential Service Water (ÚM 09.00 TVD) & Control Rooms (ÚM V01 Control Rooms)
Job no. 711 – increase of nuclear safety and seismic resistance at the Jaslovské Bohunice NPP – V2, G7 – control and coordination of tests regarding ELECTRO and I&C parts; technical inspection of the monitored equipment performed during general overhaul of Units 3 and 4 in 2008 (general overhaul of Units 3&4/2008) at Slovenské elektrárne, a. s. – plant: Bohunice NPP within the following scope:
Year: 2000
Nováky
Technical Support during the Reconstruction of the Turbine Generator and its Accessories – Nováky NPP, Unit 4 Unit 1
Technical support during the turbine generator (TG) reconstruction:
Years: 1999 – 2000
Temelín, Česká republika
Technical Support for the General Supplier of the Technological Part by Commissioning of Temelín NPP, 1. Units 1&2
Supervision over the monitors’ installation completion with reference to PP/t (Operating Instructions/technology) dPP/t (Partial Operating Instructions/technology) and respective contractors’ documentation; coordination of reference/background materials for elaboration of initial revisions; examination of the accompanying technical documentation; inspection of monitors’ connection and functioning; professional supervision over POT (pre-operational testing) and CT (commissioning testing) of the Radiation Monitoring Systems regarding: MRB (Main Reactor Building), NAB (Nuclear Auxiliary Building), MRB stacks, NAB stacks and waste water of elementary subsystems (DPS) of both units at Temelín NPP.
Completion of the Unit 2, Mochovce NPP within the scope of: projects completion, provision of the remaining deliveries, assembly completion, implementation of individual safety measures and design changes, settlement of unfinished works and their execution regarding the elementary systems: PS 03,11,14 and 54 – Unit 2.
Years: 1997 – 2000
Mochovce
Start-up Works at Mochovce NPP, 1. Units 1&2
Update of POT (Pre-operational testing) and CT (commissioning testing) programmes; elaboration of POT and CT programmes; control of PICO performance (post-installation cleaning operations) and DPS (Elementary subsystem) in compliance with the valid Technological Detail Design; control of POT and CT with reference to individual DPS; performance of hydraulic tests at the primary circuit piping, in the course of active commissioning:
ENSECO, a. s. Hollého 10/1499, 949 01 Nitra, Slovenská republika